DHA’s 13-year-old stormwater drainage system floods third time
ISLAMABAD: The Pakistani Meteorological Department has released the data for monsoon 2022, according to which Karachi received the highest at 120mm at Masroor base.
Area | Rainfall |
---|---|
PAF Masroor | 119.5 |
DHA PH 2 | 106.6 |
Nazimabad | 102 |
DHA in Karachi flooded again, much to the distress of residents. The big question was why it had flooded after the experience of 2020, and, in fact, 2007.
The monsoon of August 2007 brought in a record unprecedented 250mm in less than 12 hours, prompting the housing authority to overhaul its stormwater drainage.
Dear Residents, De Watering Operation is being hampered due to continuous rain since last night. DHA & CBC Teams are working to minimize the accumulation of rain water in DHA. All drains are working on full capacity. Please stay home.#DHAresidents #monsoon2022 #monsoon #DHA pic.twitter.com/N45ce6Vv7e
— DHA Karachi Official (@DHAKarachiOfc) July 11, 2022
M/S Techno Consultant International (headed by Dr Bashir Lakhani who built K-III successfully) was hired to create the new system. A DHA report from 2009 described the new drainage network as comprising seven Main Trunk Drains with interconnecting interceptor drains. The main trunks end at Beach Avenue on Seaview and drain rainwater into the sea. DHA said that it created drains where none existed before and linked local depressions to nearby trunks.
For the latest news, follow us on Twitter @Aaj_Urdu. We are also on Facebook, Instagram and YouTube.
Comments are closed on this story.