Aaj English TV

Thursday, October 24, 2024  
21 Rabi Al-Akhar 1446  

Shanghai Electric accelerates pace of work at Thar Block-1 despite COVID-19: Asim

He said work on mining has been done by...

ISLAMABAD: Chairman China-Pakistan Economic Corridor Authority Asim Salim Bajwa says Shanghai Electric has accelerated pace of work despite COVID-19 at Thar Block-1 both in mining and 1320 MW power plant.

In a tweet message this evening, he said work on mining has been done by 20 percent while at power plant by 15 percent.