Iran aims to restore refining capability within two months, official says
1 min readIran expects to restore most damaged refining and distribution facilities to 70–80% of their pre-attack capacity within one to two months, a senior oil official said, as authorities work to recover from a wave of strikes on energy infrastructure.
Deputy Minister of Oil Mohammad Sadeq Azimifar told the Student News Network that repair work had begun and that part of the Lavan refinery is expected to resume operations within about 10 days, with other units coming back online gradually.
For the latest news, follow us on Twitter @Aaj_Urdu. We are also on Facebook, Instagram and YouTube.
















