<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title>Aaj TV English News - Pakistan</title>
    <link>https://english.aaj.tv/</link>
    <description>Aaj TV English</description>
    <language>en-Us</language>
    <copyright>Copyright 2026</copyright>
    <pubDate>Sat, 02 May 2026 09:04:06 +0500</pubDate>
    <lastBuildDate>Sat, 02 May 2026 09:04:06 +0500</lastBuildDate>
    <ttl>60</ttl>
    <item xmlns:default="http://purl.org/rss/1.0/modules/content/">
      <title>Water supply restored to Karachi following pipeline repairs</title>
      <link>https://english.aaj.tv/news/330392538/water-supply-restored-to-karachi-following-pipeline-repairs</link>
      <description>&lt;p&gt;&lt;strong&gt;Karachi’s water supply has been restored after the successful repair of an 84-inch water pipeline on University Road, which had burst last month.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;The Karachi Water and Sewerage Corporation (KW&amp;amp;SC) announced that water flow from the Dhabeji Pumping Station resumed following the completion of the repairs.&lt;/p&gt;
&lt;p&gt;The damage occurred on November 29 during construction related to the Red Line project, leading to a significant loss of thousands of gallons of water.&lt;/p&gt;
&lt;p&gt;As a result, several &lt;a href="https://english.aaj.tv/news/330368866/karachi-dha-phase-vis-darakshan-villas-to-get-new-park-area"&gt;water pumps&lt;/a&gt; at the Dhabeji Station were shut down, causing water shortages in various areas of the city, including Gulistan-e-Jauhar, Mosmiyat, Safoora, and several blocks of Gulshan-e-Iqbal.&lt;/p&gt;
&lt;p&gt;Repair work commenced on December 3, with a team of over 300 laborers working in three shifts under the supervision of Chief Engineer WTM Zafar Palijo.&lt;/p&gt;
&lt;p&gt;Heavy machinery was utilized to &lt;a href="https://english.aaj.tv/news/330364911/pakistan-goes-from-water-stressed-to-water-scarce-status"&gt;expedite&lt;/a&gt; the process, which faced delays due to extensive de-silting and significant damage caused by drilling machines that created large holes in the pipeline.&lt;/p&gt;
&lt;p&gt;&lt;em&gt;Read more&lt;/em&gt;&lt;/p&gt;
&lt;blockquote class="blockquote-level-1"&gt;
&lt;p&gt;&lt;a href="https://english.aaj.tv/news/30289047"&gt;Water supply to Karachi suspended as pipeline bursts&lt;/a&gt;&lt;/p&gt;
&lt;/blockquote&gt;
&lt;blockquote class="blockquote-level-1"&gt;
&lt;p&gt;&lt;a href="https://english.aaj.tv/news/30302317/water-supply-to-remain-suspended-in-parts-of-karachi-for-two-days"&gt;Water supply to remain suspended in parts of Karachi for two days&lt;/a&gt;&lt;/p&gt;
&lt;/blockquote&gt;
&lt;blockquote class="blockquote-level-1"&gt;
&lt;p&gt;&lt;a href="https://english.aaj.tv/news/30239651/2020-07-15"&gt;Zardari to be indicted via video link in Thatta water supply case&lt;/a&gt;&lt;/p&gt;
&lt;/blockquote&gt;
&lt;p&gt;The KW&amp;amp;SC had previously urged residents in affected areas to conserve water during the repair period, which was projected to result in a daily loss of 150 million gallons of water.&lt;/p&gt;
&lt;p&gt;The organization confirmed that the repair work is now complete, and &lt;a href="https://english.aaj.tv/news/330361605/irsa-increases-water-share-for-punjab-and-sindh-after-higher-in-flows"&gt;water&lt;/a&gt; supply has resumed.&lt;/p&gt;
</description>
      <content:encoded xmlns="http://purl.org/rss/1.0/modules/content/"><![CDATA[<p><strong>Karachi’s water supply has been restored after the successful repair of an 84-inch water pipeline on University Road, which had burst last month.</strong></p>
<p>The Karachi Water and Sewerage Corporation (KW&amp;SC) announced that water flow from the Dhabeji Pumping Station resumed following the completion of the repairs.</p>
<p>The damage occurred on November 29 during construction related to the Red Line project, leading to a significant loss of thousands of gallons of water.</p>
<p>As a result, several <a href="https://english.aaj.tv/news/330368866/karachi-dha-phase-vis-darakshan-villas-to-get-new-park-area">water pumps</a> at the Dhabeji Station were shut down, causing water shortages in various areas of the city, including Gulistan-e-Jauhar, Mosmiyat, Safoora, and several blocks of Gulshan-e-Iqbal.</p>
<p>Repair work commenced on December 3, with a team of over 300 laborers working in three shifts under the supervision of Chief Engineer WTM Zafar Palijo.</p>
<p>Heavy machinery was utilized to <a href="https://english.aaj.tv/news/330364911/pakistan-goes-from-water-stressed-to-water-scarce-status">expedite</a> the process, which faced delays due to extensive de-silting and significant damage caused by drilling machines that created large holes in the pipeline.</p>
<p><em>Read more</em></p>
<blockquote class="blockquote-level-1">
<p><a href="https://english.aaj.tv/news/30289047">Water supply to Karachi suspended as pipeline bursts</a></p>
</blockquote>
<blockquote class="blockquote-level-1">
<p><a href="https://english.aaj.tv/news/30302317/water-supply-to-remain-suspended-in-parts-of-karachi-for-two-days">Water supply to remain suspended in parts of Karachi for two days</a></p>
</blockquote>
<blockquote class="blockquote-level-1">
<p><a href="https://english.aaj.tv/news/30239651/2020-07-15">Zardari to be indicted via video link in Thatta water supply case</a></p>
</blockquote>
<p>The KW&amp;SC had previously urged residents in affected areas to conserve water during the repair period, which was projected to result in a daily loss of 150 million gallons of water.</p>
<p>The organization confirmed that the repair work is now complete, and <a href="https://english.aaj.tv/news/330361605/irsa-increases-water-share-for-punjab-and-sindh-after-higher-in-flows">water</a> supply has resumed.</p>
]]></content:encoded>
      <category>Pakistan</category>
      <guid>https://english.aaj.tv/news/330392538</guid>
      <pubDate>Tue, 10 Dec 2024 13:07:15 +0500</pubDate>
      <author>none@none.com (Web Desk)</author>
      <media:content url="https://i.aaj.tv/large/2024/12/1012365234b7cff.webp?r=130715" type="image/webp" medium="image" height="720" width="1200">
        <media:thumbnail url="https://i.aaj.tv/thumbnail/2024/12/1012365234b7cff.webp?r=130715"/>
        <media:title/>
      </media:content>
    </item>
  </channel>
</rss>
