<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title>Aaj TV English News - Business &amp; Economy</title>
    <link>https://english.aaj.tv/</link>
    <description>Aaj TV English</description>
    <language>en-Us</language>
    <copyright>Copyright 2026</copyright>
    <pubDate>Thu, 09 Apr 2026 16:50:07 +0500</pubDate>
    <lastBuildDate>Thu, 09 Apr 2026 16:50:07 +0500</lastBuildDate>
    <ttl>60</ttl>
    <item xmlns:default="http://purl.org/rss/1.0/modules/content/">
      <title>Power sector development budget to go up by 200%</title>
      <link>https://english.aaj.tv/news/330364667/power-sector-development-budget-to-go-up-by-200</link>
      <description>&lt;p&gt;&lt;strong&gt;Pakistan’s power sector is set to receive a significant boost in the upcoming federal budget for 2024-25, with a proposed 200% increase in the development budget, bringing the total allocation to over Rs239.42 billion.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;Sources indicate that the government is also considering adding 14 new projects to the sector’s portfolio for the next fiscal year.&lt;/p&gt;
&lt;p&gt;One of the proposed projects includes a land acquisition plan for a 1200 MW solar plant in Lia, with an estimated cost of Rs6.25 billion. The budget also includes plans for energy battery storage projects, with a proposed allocation of  Rs1.58 billion.&lt;/p&gt;
&lt;p&gt;Further, the budget proposes Rs633 million for land acquisition for a 600 MW solar plant in Jhang, Rs35 billion for the Gengo One Coal Power Project, and Rs5.5 billion for upgrading the electricity transmission system.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Read more:&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;&lt;a href="https://english.aaj.tv/news/330363601/improving-electricity-supply-could-save-175000-lives-in-pak-unicef"&gt;Improving electricity supply could save 175,000 lives in Pak: UNICEF&lt;/a&gt;&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;&lt;a href="https://english.aaj.tv/news/330361768/gandapur-says-kp-will-take-over-wapda-offices-if-federal-govt-does-not-cooperate"&gt;Safety concerns force shutdown of Neelum-Jhelum Hydropower project &lt;/a&gt;&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;&lt;a href="https://english.aaj.tv/news/330360217/safety-concerns-force-shutdown-of-neelum-jhelum-hydropower-project"&gt;Safety concerns force shutdown of Neelum-Jhelum Hydropower project &lt;/a&gt;&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;Over Rs4.88 billion are proposed for the CASA 1000 Interconnection Project, while Rs4.8 billion are allocated for improving NTDC grid stations. The Dasu Hydropower Project Power Supply Phase 1 is also included in the budget, with a proposed allocation of Rs22.11 billion.&lt;/p&gt;
&lt;p&gt;    &lt;figure class='media  sm:w-1/3  w-full  media--right  media--embed  media--uneven'&gt;
        &lt;div class='media__item  media__item--newskitlink  '&gt;    &lt;iframe
        class="nk-iframe" 
        width="100%" frameborder="0" scrolling="no" style="height:250px;position:relative"
        src="https://english.aaj.tv/news/card/330363891"
        sandbox="allow-same-origin allow-scripts allow-popups allow-modals allow-forms"&gt;&lt;/iframe&gt;&lt;/div&gt;
        
    &lt;/figure&gt;&lt;/p&gt;
&lt;p&gt;Additionally, Rs1.7 billion are allocated for electricity generation from the Tarbela 5 Extension Project, and Rs5.23 billion are proposed for upgrading 500 and 220 KV grid stations.&lt;/p&gt;
&lt;p&gt;These proposed budget increases and new projects aim to address the country’s growing energy demand and improve the overall efficiency of the power sector.&lt;/p&gt;
</description>
      <content:encoded xmlns="http://purl.org/rss/1.0/modules/content/"><![CDATA[<p><strong>Pakistan’s power sector is set to receive a significant boost in the upcoming federal budget for 2024-25, with a proposed 200% increase in the development budget, bringing the total allocation to over Rs239.42 billion.</strong></p>
<p>Sources indicate that the government is also considering adding 14 new projects to the sector’s portfolio for the next fiscal year.</p>
<p>One of the proposed projects includes a land acquisition plan for a 1200 MW solar plant in Lia, with an estimated cost of Rs6.25 billion. The budget also includes plans for energy battery storage projects, with a proposed allocation of  Rs1.58 billion.</p>
<p>Further, the budget proposes Rs633 million for land acquisition for a 600 MW solar plant in Jhang, Rs35 billion for the Gengo One Coal Power Project, and Rs5.5 billion for upgrading the electricity transmission system.</p>
<p><strong>Read more:</strong></p>
<p><strong><a href="https://english.aaj.tv/news/330363601/improving-electricity-supply-could-save-175000-lives-in-pak-unicef">Improving electricity supply could save 175,000 lives in Pak: UNICEF</a></strong></p>
<p><strong><a href="https://english.aaj.tv/news/330361768/gandapur-says-kp-will-take-over-wapda-offices-if-federal-govt-does-not-cooperate">Safety concerns force shutdown of Neelum-Jhelum Hydropower project </a></strong></p>
<p><strong><a href="https://english.aaj.tv/news/330360217/safety-concerns-force-shutdown-of-neelum-jhelum-hydropower-project">Safety concerns force shutdown of Neelum-Jhelum Hydropower project </a></strong></p>
<p>Over Rs4.88 billion are proposed for the CASA 1000 Interconnection Project, while Rs4.8 billion are allocated for improving NTDC grid stations. The Dasu Hydropower Project Power Supply Phase 1 is also included in the budget, with a proposed allocation of Rs22.11 billion.</p>
<p>    <figure class='media  sm:w-1/3  w-full  media--right  media--embed  media--uneven'>
        <div class='media__item  media__item--newskitlink  '>    <iframe
        class="nk-iframe" 
        width="100%" frameborder="0" scrolling="no" style="height:250px;position:relative"
        src="https://english.aaj.tv/news/card/330363891"
        sandbox="allow-same-origin allow-scripts allow-popups allow-modals allow-forms"></iframe></div>
        
    </figure></p>
<p>Additionally, Rs1.7 billion are allocated for electricity generation from the Tarbela 5 Extension Project, and Rs5.23 billion are proposed for upgrading 500 and 220 KV grid stations.</p>
<p>These proposed budget increases and new projects aim to address the country’s growing energy demand and improve the overall efficiency of the power sector.</p>
]]></content:encoded>
      <category>Business &amp; Economy</category>
      <guid>https://english.aaj.tv/news/330364667</guid>
      <pubDate>Mon, 10 Jun 2024 16:16:03 +0500</pubDate>
      <author>none@none.com (Yasir Nazar)</author>
      <media:content url="https://i.aaj.tv/large/2024/06/1016091738b4fc8.jpg?r=161221" type="image/jpeg" medium="image" height="480" width="800">
        <media:thumbnail url="https://i.aaj.tv/thumbnail/2024/06/1016091738b4fc8.jpg?r=161221"/>
        <media:title/>
      </media:content>
    </item>
  </channel>
</rss>
