<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title>Aaj TV English News - Pakistan</title>
    <link>https://english.aaj.tv/</link>
    <description>Aaj TV English</description>
    <language>en-Us</language>
    <copyright>Copyright 2026</copyright>
    <pubDate>Thu, 23 Apr 2026 10:40:46 +0500</pubDate>
    <lastBuildDate>Thu, 23 Apr 2026 10:40:46 +0500</lastBuildDate>
    <ttl>60</ttl>
    <item xmlns:default="http://purl.org/rss/1.0/modules/content/">
      <title>Timings of two Peshawar BRT routes extended in Ramazan</title>
      <link>https://english.aaj.tv/news/30356519/timings-of-two-peshawar-brt-routes-extended-in-ramazan</link>
      <description>&lt;p&gt;&lt;strong&gt;The timings of two routes of BRT Peshawar have been increased to facilitate people in Ramazan.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;Route ER-09 which runs from Gulbehar to Phase 6 Terminal will now be operational till 9:45pm instead of 7:25pm whereas the last bus on route SR-08 will leave at 10pm instead of 9pm.&lt;/p&gt;
&lt;p&gt;Bus route SR-08 runs from Gulbahar to Mall of Hayatabad and stops at all stations.&lt;/p&gt;
&lt;p&gt;During the preparations for Eid and the last days of Ramazan, the rush of passengers is increasing. Looking after such a rush of passengers, the management of BRT Peshawar Services decided to service timing in order to facilitate the maximum number of passengers.&lt;/p&gt;
&lt;p&gt;An increase in the number of passengers has been seen on both these routes after Iftar due to which this decision was made in the larger public interest.&lt;/p&gt;
</description>
      <content:encoded xmlns="http://purl.org/rss/1.0/modules/content/"><![CDATA[<p><strong>The timings of two routes of BRT Peshawar have been increased to facilitate people in Ramazan.</strong></p>
<p>Route ER-09 which runs from Gulbehar to Phase 6 Terminal will now be operational till 9:45pm instead of 7:25pm whereas the last bus on route SR-08 will leave at 10pm instead of 9pm.</p>
<p>Bus route SR-08 runs from Gulbahar to Mall of Hayatabad and stops at all stations.</p>
<p>During the preparations for Eid and the last days of Ramazan, the rush of passengers is increasing. Looking after such a rush of passengers, the management of BRT Peshawar Services decided to service timing in order to facilitate the maximum number of passengers.</p>
<p>An increase in the number of passengers has been seen on both these routes after Iftar due to which this decision was made in the larger public interest.</p>
]]></content:encoded>
      <category>Pakistan</category>
      <guid>https://english.aaj.tv/news/30356519</guid>
      <pubDate>Sat, 30 Mar 2024 19:06:57 +0500</pubDate>
      <author>none@none.com (APP)</author>
      <media:content url="https://i.aaj.tv/large/2024/03/30190609b4a8f45.webp?r=190617" type="image/webp" medium="image" height="480" width="800">
        <media:thumbnail url="https://i.aaj.tv/thumbnail/2024/03/30190609b4a8f45.webp?r=190617"/>
        <media:title>A bus drives along the newly-built corridor of the Peshawar Bus Rapid Transit (BRT), a rapid bus transit system running along an east-west corridor, during a test-run in Peshawar on Aug. 5, 2020. AFP
</media:title>
      </media:content>
    </item>
  </channel>
</rss>
