<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:media="http://search.yahoo.com/mrss/" xmlns:content="http://purl.org/rss/1.0/modules/content/" version="2.0">
  <channel>
    <title>Aaj TV English News - Pakistan</title>
    <link>https://english.aaj.tv/</link>
    <description>Aaj TV English</description>
    <language>en-Us</language>
    <copyright>Copyright 2026</copyright>
    <pubDate>Sat, 04 Apr 2026 14:30:47 +0500</pubDate>
    <lastBuildDate>Sat, 04 Apr 2026 14:30:47 +0500</lastBuildDate>
    <ttl>60</ttl>
    <item xmlns:default="http://purl.org/rss/1.0/modules/content/">
      <title>Teen Hatti flyover to be ready on time: Administrator KMC </title>
      <link>https://english.aaj.tv/news/10262935/teen-hatti-flyover-to-be-ready-on-time-administrator-kmc</link>
      <description>&lt;p&gt;&lt;img class="align-left" title="Teen-Hatti" src="http://www.aaj.tv/wp-content/uploads/2014/05/Teen-Hatti.jpg" alt="" width="325" height="200" /&gt;&lt;strong&gt;KARACHI: KMC Administrator Rauf Akhtar Farooqui said carpeting on Teen Hatti Flyover will commence in next few days after completion of filling. &lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;He pointed out that efforts were being made to finish this project before the stipulated time that is June 2014.&lt;/p&gt;
&lt;p&gt;He said this while addressing a meeting which was attended by the Director General Technical Services Niaz Ahmed Soomro and other officers, said a statement on Wednesday.&lt;br /&gt;
Problems faced by traffic around the construction site of flyovers in Malir should also be addressed, the Administrator said.&lt;/p&gt;
&lt;p&gt;Various ongoing development projects in the city were reviewed in detail during the meeting while the progress report was also presented.&lt;/p&gt;
&lt;p&gt;The Administrator directed officers to complete the remaining works of Teen Hatti Flyover as soon as possible so that with its completion, making of Shara-e-Pakistan a signal free corridor could complete too.&lt;/p&gt;
&lt;p&gt;He also directed officers to refrain from any negligence or carelessness as completion of this project would provide considerable convenience to traffic using Shara-e-Pakistan.&lt;/p&gt;
&lt;p&gt;The Administrator also directed that special attention be paid to ensure smooth traffic flow around the construction sites particularly around the sites of Malir 15 and Malir Halt Flyovers.&lt;/p&gt;
</description>
      <content:encoded xmlns="http://purl.org/rss/1.0/modules/content/"><![CDATA[<p><img class="align-left" title="Teen-Hatti" src="http://www.aaj.tv/wp-content/uploads/2014/05/Teen-Hatti.jpg" alt="" width="325" height="200" /><strong>KARACHI: KMC Administrator Rauf Akhtar Farooqui said carpeting on Teen Hatti Flyover will commence in next few days after completion of filling. </strong></p>
<p>He pointed out that efforts were being made to finish this project before the stipulated time that is June 2014.</p>
<p>He said this while addressing a meeting which was attended by the Director General Technical Services Niaz Ahmed Soomro and other officers, said a statement on Wednesday.<br />
Problems faced by traffic around the construction site of flyovers in Malir should also be addressed, the Administrator said.</p>
<p>Various ongoing development projects in the city were reviewed in detail during the meeting while the progress report was also presented.</p>
<p>The Administrator directed officers to complete the remaining works of Teen Hatti Flyover as soon as possible so that with its completion, making of Shara-e-Pakistan a signal free corridor could complete too.</p>
<p>He also directed officers to refrain from any negligence or carelessness as completion of this project would provide considerable convenience to traffic using Shara-e-Pakistan.</p>
<p>The Administrator also directed that special attention be paid to ensure smooth traffic flow around the construction sites particularly around the sites of Malir 15 and Malir Halt Flyovers.</p>
]]></content:encoded>
      <category>Pakistan</category>
      <guid>https://english.aaj.tv/news/10262935</guid>
      <pubDate>Wed, 14 May 2014 08:23:29 +0500</pubDate>
      <author>none@none.com (Web Desk)</author>
      <media:content type="image/" medium="image">
        <media:thumbnail url="https://i.aaj.tv/english/wp-content/uploads/200&amp;quot;;s:14:&amp;quot;hwstring_small&amp;quot;;s:23:&amp;quot;height=&amp;#039;78&amp;#039; width=&amp;#039;128&amp;#039;&amp;quot;;s:4:&amp;quot;file&amp;quot;;s:22:&amp;quot;2014/05/Teen-Hatti-215x169.jpg"/>
        <media:title/>
      </media:content>
    </item>
  </channel>
</rss>
